Care facility Refurbshment
Eleni House - case study

**Case Study: Eleni House – Colchester, Essex**
**Client:** Cygnet Healthcare
**Sector:** Specialist Residential Care
**Duration:** 16 Weeks
**Executive Summary**
Bold Construction was tasked with refurbishing Eleni House, a live-in care facility dedicated to supporting adults with autism and complex needs. This project required a compliance-focused and design-sensitive approach to redefine the space into a safe, therapeutic, and fully accessible environment. Completed within the stipulated timeline and budget, the refurbishment significantly improved both operational efficiency and resident well-being.
1. **Pre-Works Condition**
- Outdated interiors with non-compliant fittings
- Unsatisfactory fire safety measures
- Limited accessibility and fragmented layout
2. **Strip-Out & Structural Works**
- Comprehensive internal strip-out
- Reinforcement of load-bearing walls
- Excavation of trenches and renewal of pipework
3. **Fire Safety & Compliance**
- Installation of FD30 fire doors
- Emergency lighting and addressable alarm systems
- Creation of a Fire Safety Logbook complete with photographic evidence
4. **Wet Room Conversions**
- Installation of anti-ligature fittings
- Use of Altro flooring
- Accessible layouts designed for ground-floor units
5. **Interior Finishes**
- Selection of a calming colour palette in collaboration with Cygnet’s clinical team
- Custom joinery for secure storage solutions
- Installation of private kitchens to promote independent living
6. **External Enhancements**
- Wheelchair-accessible ramp
- Secure fencing and a landscaped sensory garden
- Reconfiguration of staff offices to enhance safeguarding visibility
**Compliance & Documentation**
- Health & Safety file compliant with CDM 2015
- Fire safety documentation